Unable to change order in control center

ClemensB2

Bit poster
I changed my subscription to pro yesterday and can't change the order of the VMs in the control center ever since. It just jumps back to where it was. Also, after the upgrade, the order did change from what it was originally.
Is there a way to resolve this?
 
I have the same problem. I have an M1 Pro Max and am running Parallels Pro 18.2.0
Hello,
As a possible solution, kindly follow the below steps:
1) Open Parallels Desktop Control Center window
2) On the top on the Menubar -> View -> Arrange By -> None
3) Now try re-order your virtual machines.
Thank you.
 
Back
Top