Mac OS X 10.5.5
Parallels 4.0 build
Is there a way to sort (or change) the order of the machines that show up in the "Parallels Virtual Machines" window (you get this when you hit CMD-1).
And... This "window" should be named "Virtual Machines Directory" to match the command you invoke to see it. I'm going to open that one with support...
Steve
Parallels 4.0 build
Is there a way to sort (or change) the order of the machines that show up in the "Parallels Virtual Machines" window (you get this when you hit CMD-1).
And... This "window" should be named "Virtual Machines Directory" to match the command you invoke to see it. I'm going to open that one with support...
Steve